"RRR-B construction method"
-Rigid wall embankment reinforced earth wall method-

A method of constructing railroad and road embankments using geotextiles and rigid vertical walls.

This is a method of reinforced embankment construction in which a rigid wall (RC wall) integrated with the geotextile is constructed in front of the reinforced embankment constructed using a surface reinforcement (geotextile) to create a vertical or steep slope of the embankment slope. The stability of the embankment can be enhanced by using the RC wall in combination with the geotextile.

 

*For sale only in the Japanese market.

Product & Service

Features

High reliability Superior safety

High embankment restraint and low post-completion deformation.

Ease of Construction and Economy

Ease of Construction and Economy

Wide range of fill material application

A wide range of fill materials, such as construction overburden, can be applied.

Main components and installation procedures

Surface reinforcement material “KJV

Shape and Dimensions
1 roll 2.0m(W)×50.0m(L)

Welded wire mesh

Used as temporary restraint until wall construction.

Spill prevention sheet

Shape and Dimensions
1 roll 0.5m(W)×100.0m(L)
A sheet that prevents crushed stone from spilling out of the temporary restraining area.

Selection and planning of slope works according to the level of performance design.

Railroads, Roads, Construction Fill

“RRR-B construction method” -Rigid wall embankment reinforced earth wall method-の実績

Fukuoka Prefecture New land division railroad embankment construction (1058)
Fukuoka Prefecture New land division railroad embankment construction (1058)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2000
  • [Location]
    Fukuoka
Fukuoka Prefecture General national highway IC improvement embankment work (1059)
Fukuoka Prefecture General national highway IC improvement embankment work (1059)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    November 2007
  • [Location]
    Fukuoka
Fukuoka Prefecture General national highway improvement road embankment 2(1061)
Fukuoka Prefecture General national highway improvement road embankment 2(1061)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2007
  • [Location]
    Fukuoka
  • TOP>
  • Product>
  • “RRR-B construction method” -Rigid wall embankment reinforced earth wall method-