Hyogo Prefecture, road slope collapse countermeasure work (1104)

    所在地
    Hyogo
    製品/材質
    竣工
    June 2019
    規模
    40m

Related Achievements

Solar power plant earthwork (1113)
Solar power plant earthwork (1113)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Hiroshima
Cultivated land disaster restoration work (1114)
Cultivated land disaster restoration work (1114)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Gifu
Erosion control weir river channel switching work (1110)
Erosion control weir river channel switching work (1110)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2020
  • [Location]
    Tottori
  • TOP>
  • Projects>
  • Hyogo Prefecture, road slope collapse countermeasure work (1104)