Tottori Port Quay Construction (965)

Related Achievements

Fukuoka harbor navigation channel dredging (975)
Fukuoka harbor navigation channel dredging (975)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2014
  • [Location]
    Fukuoka
Shiga Lake Bottom Environment Improvement Work (961)
Shiga Lake Bottom Environment Improvement Work (961)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    November 2013
  • [Location]
    Shiga
Shimane Prefecture Dam lake bottom excavation work(968)
Shimane Prefecture Dam lake bottom excavation work(968)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    September 2015
  • [Location]
    Shimane