H27 port repair work (public) clear carry-over, Part 1 H28 port repair work (prefectural), Part 1 merger

    施主
    Kanagawa Prefecture Odawara Civil Engineering Office
    所在地
    Kanagawa
    製品/材質
    竣工
    November 2016
    規模
    100m

Related Achievements

Fukuoka harbor navigation channel dredging (975)
Fukuoka harbor navigation channel dredging (975)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2014
  • [Location]
    Fukuoka
Shiga Lake Bottom Environment Improvement Work (961)
Shiga Lake Bottom Environment Improvement Work (961)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    November 2013
  • [Location]
    Shiga
Shimane Prefecture Dam lake bottom excavation work(968)
Shimane Prefecture Dam lake bottom excavation work(968)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    September 2015
  • [Location]
    Shimane
  • TOP>
  • Projects>
  • H27 port repair work (public) clear carry-over, Part 1 H28 port repair work (prefectural), Part 1 merger