Projects
Land development / Facilities and other Project Portfolio
Current search settings
- business:Civil engineering
- Purpose / Application:Land development / Facilities and otherSetting Change
- Location:HiroshimaSetting Change
Hiroshima Prefecture Erosion Control Slope Protection Work (734)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- August 2016
-
- [Location]
- Hiroshima
Erosion control slope protection work in Hiroshima Prefecture (731)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- March 2018
-
- [Location]
- Hiroshima
Hiroshima Prefecture Erosion Control Slope Protection Work (727)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- April 2013
-
- [Location]
- Hiroshima
Hiroshima Pref. Bridge Lower Three-surface Channel Construction (726)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- June 2002
-
- [Location]
- Hiroshima
Solar power plant earthwork (1113)
-
- [Products & Services]
- "Max Wall"-Continuous box-type steel frame-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- April 2020
-
- [Location]
- Hiroshima
Weed control on slope of solar power plant, Hiroshima (1108)
-
- [Products & Services]
- "TACOSOL"-Photovoltaic basemat construction method -
-
- [Purpose / Application]
-
- [completion of construction]
- September 2020
-
- [Location]
- Hiroshima
Hiroshima Prefecture, Landscaping work in park (1110)
-
- [Products & Services]
- Honeycomb Frame Spike
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- December 2015
-
- [Location]
- Hiroshima
Hiroshima Prefecture, gymnasium construction work (1052)
-
- [Products & Services]
- "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
-
- [Purpose / Application]
- Lightweight embankment / Reinforced soil
-
- [completion of construction]
- August 2002
-
- [Location]
- Hiroshima
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities
Filter by location
- Hokkaido
- Aomori
- Iwate
- Miyagi
- Akita
- Yamagata
- Fukushima
- Saitama
- Chiba
- Tokyo
- Kanagawa
- Tochigi
- Gumma
- Ibaraki
- Nigata
- Yamanashi
- Nagano
- Toyama
- Ishikawa
- Fukui
- Gifu
- Shizuoka
- Aichi
- Shiga
- Kyoto
- Osaka
- Hyogo
- Wakayama
- Tottori
- Shimane
- Okayama
- Hiroshima
- Tokushima
- Ehime
- Fukuoka
- Saga
- Oita
- Nagasaki
- Kumamoto
- Miyazaki
- Kagoshima



