Projects
Soft ground measures Project Portfolio
Current search settings
- business:Civil engineering
- Purpose / Application:Soft ground measuresSetting Change
- Location:No settingsSetting Change
Miyazaki Pref. road widening 2(894)
-
- [Products & Services]
- "EDO-EPS Method"-Lightweight embankment method-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- July 2005 - January 2006
-
- [Location]
- Miyazaki
Hiroshima Prefecture Sidewalk widening (874)
-
- [Products & Services]
- "EDO-EPS Method"-Lightweight embankment method-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- January 2007 - February 2007
-
- [Location]
- Hiroshima
Kanagawa Prefecture Landfill ground improvement work (847)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- June 2018
-
- [Location]
- Kanagawa
Aichi Prefecture Land development project for seaside airport island soft ground countermeasure work (848)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- July 2009
-
- [Location]
- Aichi
Osaka Prefecture Soft Ground Surface Treatment Measures (850)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- May 2011
-
- [Location]
- Osaka
Gifu Pref. Construction for ground improvement measures for foundation of expressway JCT structure (849)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- April 2010
-
- [Location]
- Gifu
Fukuoka Prefecture Soft Ground Surface Treatment (Installation of Reinforcing Material) Measures (851)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- September 2014
-
- [Location]
- Fukuoka
Fukushima Decontamination Soil Storage Operations Soft Ground Countermeasure Work (846)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- December 2016
-
- [Location]
- Fukushima
Minami Honmoku reclamation work (Block 4 ground improvement work No. 14)
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- June 2018
-
- [Location]
- Kanagawa
Minamisoma City decontamination and storage management of removed soil, etc.
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- December 2016
-
- [Location]
- Fukushima
Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- April 2014
-
- [Location]
- Tokyo
- 1
- 2
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities



