Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
-
- [Products & Services]
- "Strong Grid TSG"-for soft ground-
-
- [Purpose / Application]
- Soft ground measures
-
- [completion of construction]
- April 2014
-
- [Location]
- Tokyo
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities