Mie Prefecture Breakwater Repair Work(606)
Mie Prefecture Breakwater Repair Work(606)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    September 2010
  • [Location]
    Mie
Mie Prefecture Hutou Bridge Lower Structure Construction(958)
Mie Prefecture Hutou Bridge Lower Structure Construction(958)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2013
  • [Location]
    Mie
Mie Prefecture Bridge substructure construction1(954)
Mie Prefecture Bridge substructure construction1(954)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2016
  • [Location]
    Mie
Mie Prefecture Bridge substructure construction3(956)
Mie Prefecture Bridge substructure construction3(956)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2017
  • [Location]
    Mie
Yokkaichi Port Kasumigafuchi North Pier Area Road (Kasumi No. 4 Main Line) Bridge Construction
Yokkaichi Port Kasumigafuchi North Pier Area Road (Kasumi No. 4 Main Line) Bridge Construction
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    October 2012
  • [Location]
    Mie
Yokkaichi Port Kasumigaura North Pier Area Kasumi No.4 Main Bridge Lower Section (P38? P47)
Yokkaichi Port Kasumigaura North Pier Area Kasumi No.4 Main Bridge Lower Section (P38? P47)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2013