Projects
Ports and Oceans Project Portfolio
Current search settings
- business:Civil engineering
- Purpose / Application:Ports and OceansSetting Change
- Location:No settingsSetting Change
Osaka Port North Port South Area Navigation Channel Ancillary Facilities Infrastructure Work (Section 1)
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- June 2013
-
- [Location]
- Osaka
Installation of water sealing membrane at Taketoyo Thermal Power Station intake of Chubu Electric Power Co.
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
-
- [completion of construction]
- March 2001
-
- [Location]
- Aichi
Construction of ash dumping site revetment on the north side of the front face of the Kinuura No. 1 site
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- March 2018
-
- [Location]
- Aichi
2013 Nagoya Port East Passage (-16m) Dredged soil discharge work
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- December 2013
-
- [Location]
- Aichi
Kawasaki Port Harbor Harbor Road, Higashi Ogishima Mizue-cho Line, Main Bridge Section (MP2), Bridge Lower Section
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- March 2016
-
- [Location]
- Kanagawa
Mizushima Port Mizushima-Tamashima Area Harbor Road (Watershed Section) Bridge Lower Section (Part 3)
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- May 2013
-
- [Location]
- Okayama
Ozaki Sen Iwata Coastal erosion control work
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- July 2016
-
- [Location]
- Miyagi
Kawasaki Port Harbor Harbor Road, Higashi Ogishima Mizue-cho Line, Main Bridge Section (MP3), Bridge Lower Section
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- March 2016
-
- [Location]
- Kanagawa
Tsuruga Nuclear Power Station Water discharge outlet Pollution control work
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- November 2010
-
- [Location]
- Fukui
Chubu Electric Power Co., Inc. deep water intake facility at Shin-Nagoya Thermal Power Station, installation of water sealing membrane
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
-
- [completion of construction]
- March 2001
-
- [Location]
- Aichi
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities