Projects
Rrivers and Dams Project Portfolio
Current search settings
- business:Civil engineering
- Purpose / Application:Rrivers and DamsSetting Change
- Location:WakayamaSetting Change
Wakayama Prefecture Weir Area Maintenance Revetment Work (720)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- September 2013
-
- [Location]
- Wakayama
Wakayama Prefecture River disaster restoration three-surface water channel construction (716)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- February 2015
-
- [Location]
- Wakayama
Wakayama Prefecture Road surface protection work at a reservoir associated with road improvement work (714)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Rivers / Reservoirs / Regulating reservoirs
-
- [completion of construction]
- December 2011
-
- [Location]
- Wakayama
Wakayama Station Area Compartmentalization Project Regulating Pond Slope Protection Work (712)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- December 2013
-
- [Location]
- Wakayama
Wakayama Prefecture Reservoir improvement slope protection work (711)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- December 2009
-
- [Location]
- Wakayama
Wakayama Prefecture, Japan Three-surface channel construction (710)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- March 2017
-
- [Location]
- Wakayama
Wakayama River Weir Temporary Closing Revetment 1(820)
-
- [Products & Services]
- "Max Wall"-Continuous box-type steel frame-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- August 2014
-
- [Location]
- Wakayama
Wakayama Pref. River Weir Temporary Closing Revetment Work 3(822)
-
- [Products & Services]
- "Max Wall"-Continuous box-type steel frame-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- October 2014
-
- [Location]
- Wakayama
Wakayama Prefecture river weir disaster restoration peripheral maintenance work (819)
-
- [Products & Services]
- "Max Wall"-Continuous box-type steel frame-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- April 2015
-
- [Location]
- Wakayama
Wakayama River Weir Temporary Closing Revetment 2 (821)
-
- [Products & Services]
- "Max Wall"-Continuous box-type steel frame-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- September 2014
-
- [Location]
- Wakayama
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities
Filter by location
- Hokkaido
- Aomori
- Iwate
- Miyagi
- Yamagata
- Fukushima
- Saitama
- Chiba
- Tokyo
- Kanagawa
- Tochigi
- Gumma
- Ibaraki
- Nigata
- Nagano
- Toyama
- Ishikawa
- Fukui
- Gifu
- Shizuoka
- Mie
- Aichi
- Shiga
- Kyoto
- Osaka
- Hyogo
- Nara
- Wakayama
- Tottori
- Shimane
- Okayama
- Hiroshima
- Yamaguchi
- Tokushima
- Ehime
- Kochi
- Fukuoka
- Oita
- Nagasaki
- Kumamoto
- Miyazaki
- Kagoshima



