Projects

Rrivers and Dams Project Portfolio

back to Projects TOP

Current search settings
Wakayama Prefecture Weir Area Maintenance Revetment Work (720)
Wakayama Prefecture Weir Area Maintenance Revetment Work (720)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    September 2013
  • [Location]
    Wakayama
Wakayama Prefecture River disaster restoration three-surface water channel construction (716)
Wakayama Prefecture River disaster restoration three-surface water channel construction (716)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    February 2015
  • [Location]
    Wakayama
Wakayama Prefecture Road surface protection work at a reservoir associated with road improvement work (714)
Wakayama Prefecture Road surface protection work at a reservoir associated with road improvement work (714)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Rivers / Reservoirs / Regulating reservoirs
  • [completion of construction]
    December 2011
  • [Location]
    Wakayama
Wakayama Station Area Compartmentalization Project Regulating Pond Slope Protection Work (712)
Wakayama Station Area Compartmentalization Project Regulating Pond Slope Protection Work (712)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2013
  • [Location]
    Wakayama
Wakayama Prefecture Reservoir improvement slope protection work (711)
Wakayama Prefecture Reservoir improvement slope protection work (711)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2009
  • [Location]
    Wakayama
Wakayama Prefecture, Japan Three-surface channel construction (710)
Wakayama Prefecture, Japan Three-surface channel construction (710)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    March 2017
  • [Location]
    Wakayama
Wakayama River Weir Temporary Closing Revetment 1(820)
Wakayama River Weir Temporary Closing Revetment 1(820)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    August 2014
  • [Location]
    Wakayama
Wakayama Pref. River Weir Temporary Closing Revetment Work 3(822)
Wakayama Pref. River Weir Temporary Closing Revetment Work 3(822)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2014
  • [Location]
    Wakayama
Wakayama Prefecture river weir disaster restoration peripheral maintenance work (819)
Wakayama Prefecture river weir disaster restoration peripheral maintenance work (819)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2015
  • [Location]
    Wakayama
Wakayama River Weir Temporary Closing Revetment 2 (821)
Wakayama River Weir Temporary Closing Revetment 2 (821)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    September 2014
  • [Location]
    Wakayama
Wakayama Repair of river slope(823)
Wakayama Repair of river slope(823)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    May 2014
  • [Location]
    Wakayama
Restoration work for typhoon damage in Wakayama Prefecture (827)
Restoration work for typhoon damage in Wakayama Prefecture (827)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    November 2011
  • [Location]
    Wakayama