Products & Services

Temporary construction / Rockfall protection / Earth retaining

“Max Wall”-Continuous box-type steel frame-
“Max Wall”-Continuous box-type steel frame-
Continuous earth embankments can be installed quickly and easily.
“MWG Method”-Temporary protective fence construction-
“MWG Method”-Temporary protective fence construction-
This method is to fill a continuous box-shaped steel frame (mesh wall) with earth and sand to form the foundation of a temporary rockfall protection fence, enabling rockfall protection during construction without rooting (pile driving) into the road surface.
“MAX BAG(MXB-3 type)”-Large weather-resistant sandbag-
“MAX BAG(MXB-3 type)”-Large weather-resistant sandbag-
Suitable for a wide range of applications such as disaster recovery, long-term temporary installation, and disaster stockpiling.
Large sandbags for quick and easy installation.
“SAM Method”-Rockfall buffer method-
“SAM Method”-Rockfall buffer method-
A low-cost, high-performance rockfall buffer method for use on roadway caverns.

Temporary construction / Rockfall protection / Earth retaining Project Portfolio

Repair of agricultural canals due to typhoon damage, Part 2 (1112)
Repair of agricultural canals due to typhoon damage, Part 2 (1112)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2019
  • [Location]
    Miyagi
Solar power plant earthwork (1113)
Solar power plant earthwork (1113)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Hiroshima
Cultivated land disaster restoration work (1114)
Cultivated land disaster restoration work (1114)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Gifu