Projects

Roads / Railways Project Portfolio

back to Projects TOP

Current search settings
Gunma Prefecture Multi-level intersection road widening (857)
Gunma Prefecture Multi-level intersection road widening (857)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    November 2003
  • [Location]
    Gumma
Gunma Prefecture road slope earth retaining disaster restoration work (844)
Gunma Prefecture road slope earth retaining disaster restoration work (844)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Gumma