Projects

Roads / Railways Project Portfolio

back to Projects TOP

Current search settings
Gifu Prefecture Three-surface waterway lining for road reconstruction (587)
Gifu Prefecture Three-surface waterway lining for road reconstruction (587)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    September 2010
  • [Location]
    Gifu
Gifu Prefecture, Road reinforced soil wall lower slope protection work (585)
Gifu Prefecture, Road reinforced soil wall lower slope protection work (585)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2006
  • [Location]
    Gifu
Gifu Prefecture, Agricultural road channel slope protection work (577)
Gifu Prefecture, Agricultural road channel slope protection work (577)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    October 2014
  • [Location]
    Gifu
Gifu Prefecture Single Prefectural Collapse Breach Prevention Work (General Route 303)
Gifu Prefecture Single Prefectural Collapse Breach Prevention Work (General Route 303)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    July 2012
  • [Location]
    Gifu
Gifu Prefecture Road Disaster Prevention Work
Gifu Prefecture Road Disaster Prevention Work
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2003
  • [Location]
    Gifu
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    March 2012
  • [Location]
    Gifu
Gifu Prefecture road disaster restoration work (865)
Gifu Prefecture road disaster restoration work (865)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2010
  • [Location]
    Gifu
Gifu Pref. Construction for ground improvement measures for foundation of expressway JCT structure (849)
Gifu Pref. Construction for ground improvement measures for foundation of expressway JCT structure (849)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    April 2010
  • [Location]
    Gifu
FY 2008 Chuo Expressway Nakatsugawa IC to Sonohara IC maintenance and repair work
FY 2008 Chuo Expressway Nakatsugawa IC to Sonohara IC maintenance and repair work
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    October 1, 2016
  • [Location]
    Gifu
Tokai Kanjo Yoro JCT Naohe Chuo Area Mattress
Tokai Kanjo Yoro JCT Naohe Chuo Area Mattress
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    April 2010
  • [Location]
    Gifu