Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)

Related Achievements

Kagoshima National Highway Disaster Prevention Work (1045)
Kagoshima National Highway Disaster Prevention Work (1045)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2003
  • [Location]
    Kagoshima
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2001
  • [Location]
    Fukuoka
  • TOP>
  • Projects>
  • Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)