Kagoshima National Highway Disaster Prevention Work (1045)

Related Achievements

Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    March 2012
  • [Location]
    Gifu
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2001
  • [Location]
    Fukuoka
  • TOP>
  • Projects>
  • Kagoshima National Highway Disaster Prevention Work (1045)