Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)

Related Achievements

Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    March 2012
  • [Location]
    Gifu
Kagoshima National Highway Disaster Prevention Work (1045)
Kagoshima National Highway Disaster Prevention Work (1045)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2003
  • [Location]
    Kagoshima
  • TOP>
  • Projects>
  • Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)