Projects

Temporary construction / Rockfall protection / Earth retaining Project Portfolio

back to Projects TOP

Current search settings
  • business:Civil engineering
  • Purpose / Application:Temporary construction / Rockfall protection / Earth retainingSetting Change
  • Location:GummaSetting Change
Gunma slope disaster restoration work (1102)
Gunma slope disaster restoration work (1102)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2020
  • [Location]
    Gumma
Gunma Prefecture road slope earth retaining disaster restoration work (844)
Gunma Prefecture road slope earth retaining disaster restoration work (844)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Gumma
Gunma Prefecture River bank raising (810)
Gunma Prefecture River bank raising (810)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    August 2016
  • [Location]
    Gumma
  • TOP>
  • Projects>
  • Temporary construction / Rockfall protection / Earth retaining Project Portfolio