Projects
Temporary construction / Rockfall protection / Earth retaining Project Portfolio
Current search settings
- business:Civil engineering
- Purpose / Application:Temporary construction / Rockfall protection / Earth retainingSetting Change
- Location:GifuSetting Change
Cultivated land disaster restoration work (1114)
-
- [Products & Services]
- "Max Wall"-Continuous box-type steel frame-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- April 2020
-
- [Location]
- Gifu
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
-
- [Products & Services]
- "SAM Method"-Rockfall buffer method-
-
- [Purpose / Application]
- Temporary construction / Rockfall protection / Earth retaining
-
- [completion of construction]
- March 2012
-
- [Location]
- Gifu
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities



