Projects

Temporary construction / Rockfall protection / Earth retaining Project Portfolio

back to Projects TOP

Current search settings
  • business:Civil engineering
  • Purpose / Application:Temporary construction / Rockfall protection / Earth retainingSetting Change
  • Location:FukuokaSetting Change
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2001
  • [Location]
    Fukuoka
Fukuoka, Japan Temporary river crossing work (838)
Fukuoka, Japan Temporary river crossing work (838)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    November 2015
  • [Location]
    Fukuoka
Earth retaining work at foundation of temporary bridge for disaster restoration, Fukuoka Prefecture (839)
Earth retaining work at foundation of temporary bridge for disaster restoration, Fukuoka Prefecture (839)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2017
  • [Location]
    Fukuoka
  • TOP>
  • Projects>
  • Temporary construction / Rockfall protection / Earth retaining Project Portfolio