Projects

Temporary construction / Rockfall protection / Earth retaining Project Portfolio

back to Projects TOP

Current search settings
  • business:Civil engineering
  • Purpose / Application:Temporary construction / Rockfall protection / Earth retainingSetting Change
  • Location:No settingsSetting Change
Wakayama Repair of river slope(823)
Wakayama Repair of river slope(823)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    May 2014
  • [Location]
    Wakayama
Miyagi Prefecture Temporary seawall construction (803)
Miyagi Prefecture Temporary seawall construction (803)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    July 2012
  • [Location]
    Miyagi
Temporary road construction for landslide protection forest construction in Niigata Prefecture (814)
Temporary road construction for landslide protection forest construction in Niigata Prefecture (814)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2017
  • [Location]
    Nigata
Iwate Prefecture Disaster Waste Removal Yard Raising
Iwate Prefecture Disaster Waste Removal Yard Raising
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2012
  • [Location]
    Iwate
Kyoto Fishing port water retaining wall construction (816)
Kyoto Fishing port water retaining wall construction (816)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2017
  • [Location]
    Kyoto
Iwate Prefecture Fishing port disaster restoration raising work (802)
Iwate Prefecture Fishing port disaster restoration raising work (802)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2013
  • [Location]
    Iwate
Iwate Prefecture Watertight earth retaining wall construction (798)
Iwate Prefecture Watertight earth retaining wall construction (798)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2015
  • [Location]
    Iwate
Miyagi Prefecture Fishing port disaster recovery breakwater raising (804)
Miyagi Prefecture Fishing port disaster recovery breakwater raising (804)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2012
  • [Location]
    Miyagi
Iwate River sluice gate sedimentation basin earth retaining wall construction (801)
Iwate River sluice gate sedimentation basin earth retaining wall construction (801)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2013
  • [Location]
    Iwate
Gunma Prefecture River bank raising (810)
Gunma Prefecture River bank raising (810)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    August 2016
  • [Location]
    Gumma
Yamagata Prefecture Erosion control weir landslide prevention work (807)
Yamagata Prefecture Erosion control weir landslide prevention work (807)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    November 2015
  • [Location]
    Yamagata
Saitama Pref. Provisional embankment raising for river emergency flood control measures (811)
Saitama Pref. Provisional embankment raising for river emergency flood control measures (811)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2016
  • [Location]
    Saitama
  • TOP>
  • Projects>
  • Temporary construction / Rockfall protection / Earth retaining Project Portfolio