Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Fukushima Prefecture Final disposal site adjustment pond slope protection work (528)
Fukushima Prefecture Final disposal site adjustment pond slope protection work (528)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    October 2018
  • [Location]
    Fukushima
Fukushima Prefecture Harbor revetment wall improvement slope protection work (527)
Fukushima Prefecture Harbor revetment wall improvement slope protection work (527)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    June 2014
  • [Location]
    Fukushima
Fukushima Prefecture Forest Road Facility Disaster Restoration Three-sided Canal Stretching Work (526)
Fukushima Prefecture Forest Road Facility Disaster Restoration Three-sided Canal Stretching Work (526)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    July 2018
  • [Location]
    Fukushima
Fukushima Prefecture Road bridge three-surface channel maintenance work (525)
Fukushima Prefecture Road bridge three-surface channel maintenance work (525)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    November 2016
  • [Location]
    Fukushima
Fukushima Decontamination Project Temporary storage site construction adjustment pond slope protection work (524)
Fukushima Decontamination Project Temporary storage site construction adjustment pond slope protection work (524)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2014
  • [Location]
    Fukushima
Fukushima Repair of cave-in gate and protective covering for falling rocks and snow (523)
Fukushima Repair of cave-in gate and protective covering for falling rocks and snow (523)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    March 2018
  • [Location]
    Fukushima
Fukushima Port Quay (earthquake-proof) main body construction (920)
Fukushima Port Quay (earthquake-proof) main body construction (920)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    March 2019
  • [Location]
    Fukushima
Fukushima Prefecture Typhoon disaster restoration slope earth retaining work (840)
Fukushima Prefecture Typhoon disaster restoration slope earth retaining work (840)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    February 2020
  • [Location]
    Fukushima
Fukushima Prefecture Typhoon disaster restoration river earthwork 2(842)
Fukushima Prefecture Typhoon disaster restoration river earthwork 2(842)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2020
  • [Location]
    Fukushima
Fukushima Prefecture Typhoon disaster restoration slope earth retaining work 1(841)
Fukushima Prefecture Typhoon disaster restoration slope earth retaining work 1(841)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    February 2020
  • [Location]
    Fukushima
Fukushima typhoon disaster restoration river earth retaining works 3(843)
Fukushima typhoon disaster restoration river earth retaining works 3(843)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2020
  • [Location]
    Fukushima
Fukushima Decontamination Soil Storage Operations Soft Ground Countermeasure Work (846)
Fukushima Decontamination Soil Storage Operations Soft Ground Countermeasure Work (846)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    December 2016
  • [Location]
    Fukushima