Projects
Civil engineering Project Portfolio
Current search settings
- business:Products and Services
- Purpose / Application:No settingsSetting Change
- Location:GummaSetting Change
Gunma Prefecture Protection of outer slope of water catchment well (547)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- August 2017
-
- [Location]
- Gumma
Gunma Prefecture, High rail renewal river slope protection work (546)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- November 2018
-
- [Location]
- Gumma
Gunma Prefecture, Forest Road Improvement Project, Three-sided Canal Stretching (545)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- October 2018
-
- [Location]
- Gumma
Gunma Prefecture Three-sided waterway lining work (544)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- January 2018
-
- [Location]
- Gumma
Gunma Prefecture Drainage channel maintenance three-sided channel stretching work (543)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- August 2016
-
- [Location]
- Gumma
Gunma Prefecture Road shoulder repair three-sided waterway lining work (542)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- April 2019
-
- [Location]
- Gumma
Gunma Prefecture Drainage channel maintenance three-sided channel stretching work (541)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
-
- [completion of construction]
- April 2018
-
- [Location]
- Gumma
Gunma Prefecture Rockfall protection buffer protection work 3(540)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- September 2017
-
- [Location]
- Gumma
Gunma Prefecture Rockfall protection buffer protection work 2(539)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- September 2017
-
- [Location]
- Gumma
Gunma Prefecture Rockfall protection buffer protection work1(538)
-
- [Products & Services]
- "TACOM"-Fabric formwork-
-
- [Purpose / Application]
- Slope protection
-
- [completion of construction]
- September 2018
-
- [Location]
- Gumma
- 1
- 2
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities
Filter by location
- Hokkaido
- Aomori
- Iwate
- Miyagi
- Akita
- Yamagata
- Fukushima
- Saitama
- Chiba
- Tokyo
- Kanagawa
- Tochigi
- Gumma
- Ibaraki
- Nigata
- Yamanashi
- Nagano
- Toyama
- Ishikawa
- Fukui
- Gifu
- Shizuoka
- Mie
- Aichi
- Shiga
- Kyoto
- Osaka
- Hyogo
- Nara
- Wakayama
- Tottori
- Shimane
- Okayama
- Hiroshima
- Yamaguchi
- Tokushima
- Ehime
- Kochi
- Fukuoka
- Saga
- Oita
- Nagasaki
- Kumamoto
- Miyazaki
- Kagoshima
- Okinawa



