Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Gunma Prefecture Protection of outer slope of water catchment well (547)
Gunma Prefecture Protection of outer slope of water catchment well (547)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    August 2017
  • [Location]
    Gumma
Gunma Prefecture, High rail renewal river slope protection work (546)
Gunma Prefecture, High rail renewal river slope protection work (546)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2018
  • [Location]
    Gumma
Gunma Prefecture, Forest Road Improvement Project, Three-sided Canal Stretching (545)
Gunma Prefecture, Forest Road Improvement Project, Three-sided Canal Stretching (545)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    October 2018
  • [Location]
    Gumma
Gunma Prefecture Three-sided waterway lining work (544)
Gunma Prefecture Three-sided waterway lining work (544)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    January 2018
  • [Location]
    Gumma
Gunma Prefecture Drainage channel maintenance three-sided channel stretching work (543)
Gunma Prefecture Drainage channel maintenance three-sided channel stretching work (543)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    August 2016
  • [Location]
    Gumma
Gunma Prefecture Road shoulder repair three-sided waterway lining work (542)
Gunma Prefecture Road shoulder repair three-sided waterway lining work (542)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    April 2019
  • [Location]
    Gumma
Gunma Prefecture Drainage channel maintenance three-sided channel stretching work (541)
Gunma Prefecture Drainage channel maintenance three-sided channel stretching work (541)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    April 2018
  • [Location]
    Gumma
Gunma Prefecture Rockfall protection buffer protection work 3(540)
Gunma Prefecture Rockfall protection buffer protection work 3(540)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    September 2017
  • [Location]
    Gumma
Gunma Prefecture Rockfall protection buffer protection work 2(539)
Gunma Prefecture Rockfall protection buffer protection work 2(539)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    September 2017
  • [Location]
    Gumma
Gunma Prefecture Rockfall protection buffer protection work1(538)
Gunma Prefecture Rockfall protection buffer protection work1(538)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    September 2018
  • [Location]
    Gumma
Gunma Prefecture Comprehensive maintenance three-surface canal lining work (537)
Gunma Prefecture Comprehensive maintenance three-surface canal lining work (537)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    January 2017
  • [Location]
    Gumma
Gunma slope disaster restoration work (1102)
Gunma slope disaster restoration work (1102)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2020
  • [Location]
    Gumma