Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Osaka Park Slope Surface Construction (1098)
Osaka Park Slope Surface Construction (1098)
  • [Products & Services]
    Honeycomb Frame Spike
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2021
  • [Location]
    Osaka
Osaka Prefecture High-standard river bank slope protection work (multinatural revetment greening) (1097)
Osaka Prefecture High-standard river bank slope protection work (multinatural revetment greening) (1097)
  • [Products & Services]
    Honeycomb Frame Spike
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    October 1997
  • [Location]
    Osaka
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 1(949)
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 1(949)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2013
  • [Location]
    Osaka
Osaka Pollution Control Membrane Installation (948)
Osaka Pollution Control Membrane Installation (948)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    October 2012
  • [Location]
    Osaka
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 2 (950)
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 2 (950)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2013
  • [Location]
    Osaka
Osaka Pref. Infrastructure work for ancillary facilities of navigation channel 4(952)
Osaka Pref. Infrastructure work for ancillary facilities of navigation channel 4(952)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2013
  • [Location]
    Osaka
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 3(951)
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 3(951)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2013
  • [Location]
    Osaka
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 5(953)
Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 5(953)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2013
  • [Location]
    Osaka
Osaka Prefecture Soft Ground Surface Treatment Measures (850)
Osaka Prefecture Soft Ground Surface Treatment Measures (850)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    May 2011
  • [Location]
    Osaka
Osaka Prefecture Road Disaster Restoration Earth Retaining Work (817)
Osaka Prefecture Road Disaster Restoration Earth Retaining Work (817)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    March 2016
  • [Location]
    Osaka
Installation of Pollution Control Membrane in Hannan District 2
Installation of Pollution Control Membrane in Hannan District 2
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    October 2012
  • [Location]
    Osaka
Osaka Port North Port South Area Navigation Channel Ancillary Facilities Infrastructure Work (2 construction sections)
Osaka Port North Port South Area Navigation Channel Ancillary Facilities Infrastructure Work (2 construction sections)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2013
  • [Location]
    Osaka