Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Hiroshima Prefecture Erosion Control Slope Protection Work (734)
Hiroshima Prefecture Erosion Control Slope Protection Work (734)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    August 2016
  • [Location]
    Hiroshima
Protection of dam river slope, Hiroshima Prefecture (733)
Protection of dam river slope, Hiroshima Prefecture (733)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    February 2010
  • [Location]
    Hiroshima
Dam construction river slope protection, Hiroshima Prefecture (732)
Dam construction river slope protection, Hiroshima Prefecture (732)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    July 2002
  • [Location]
    Hiroshima
Erosion control slope protection work in Hiroshima Prefecture (731)
Erosion control slope protection work in Hiroshima Prefecture (731)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2018
  • [Location]
    Hiroshima
Hiroshima Prefecture River repair slope protection work (730)
Hiroshima Prefecture River repair slope protection work (730)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2007
  • [Location]
    Hiroshima
Hiroshima Prefecture Dam river slope maintenance, repair and protection work (729)
Hiroshima Prefecture Dam river slope maintenance, repair and protection work (729)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    February 2012
  • [Location]
    Hiroshima
Hiroshima Prefecture road maintenance work
Hiroshima Prefecture road maintenance work
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2016
  • [Location]
    Hiroshima
Hiroshima Prefecture Erosion Control Slope Protection Work (727)
Hiroshima Prefecture Erosion Control Slope Protection Work (727)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    April 2013
  • [Location]
    Hiroshima
Hiroshima Pref. Bridge Lower Three-surface Channel Construction (726)
Hiroshima Pref. Bridge Lower Three-surface Channel Construction (726)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    June 2002
  • [Location]
    Hiroshima
Solar power plant earthwork (1113)
Solar power plant earthwork (1113)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Hiroshima
Tentative raising of river revetment embankment (1105)
Tentative raising of river revetment embankment (1105)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    November 2020
  • [Location]
    Hiroshima
Weed control on slope of solar power plant, Hiroshima (1108)
Weed control on slope of solar power plant, Hiroshima (1108)
  • [Products & Services]
    "TACOSOL"-Photovoltaic basemat construction method -
  • [Purpose / Application]
  • [completion of construction]
    September 2020
  • [Location]
    Hiroshima