Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Hiroshima Prefecture Road improvement and widening (872)
Hiroshima Prefecture Road improvement and widening (872)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    December 2002
  • [Location]
    Hiroshima
Hiroshima Prefecture road improvement and widening work (876)
Hiroshima Prefecture road improvement and widening work (876)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 1999
  • [Location]
    Hiroshima
Hiroshima Prefecture road widening (873)
Hiroshima Prefecture road widening (873)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    January 2005
  • [Location]
    Hiroshima
Hiroshima, Japan Barrier-free school facility project slope construction (875)
Hiroshima, Japan Barrier-free school facility project slope construction (875)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    December 2012
  • [Location]
    Hiroshima
Hiroshima Prefecture, sidewalk installation (877)
Hiroshima Prefecture, sidewalk installation (877)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2012
  • [Location]
    Hiroshima
Hiroshima Prefecture Sidewalk widening (874)
Hiroshima Prefecture Sidewalk widening (874)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    January 2007 - February 2007
  • [Location]
    Hiroshima
Hiroshima Prefecture Erosion control river revetment earth retaining wall construction (829)
Hiroshima Prefecture Erosion control river revetment earth retaining wall construction (829)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2019
  • [Location]
    Hiroshima
Hiroshima Prefecture Disaster emergency measures water channel raising work (828)
Hiroshima Prefecture Disaster emergency measures water channel raising work (828)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    November 2014
  • [Location]
    Hiroshima
Storm surge control work on the Saruho River in the Ohta River system (Nippo 2 construction area)
Storm surge control work on the Saruho River in the Ohta River system (Nippo 2 construction area)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2016
  • [Location]
    Hiroshima
Lower part of the Heiwa Ohashi Pedestrian Bridge (Part 2)
Lower part of the Heiwa Ohashi Pedestrian Bridge (Part 2)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    October 2015
  • [Location]
    Hiroshima