Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Tokyo Metropolitan Government Levee Repair Slope Protection Work (557)
Tokyo Metropolitan Government Levee Repair Slope Protection Work (557)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    February 2015
  • [Location]
    Tokyo
Tokyo Aggregate washing pond protection (556)
Tokyo Aggregate washing pond protection (556)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Rivers / Reservoirs / Regulating reservoirs
  • [completion of construction]
    April 2014
  • [Location]
    Tokyo
Tokyo Metropolitan Government River revetment slope protection work (555)
Tokyo Metropolitan Government River revetment slope protection work (555)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2013
  • [Location]
    Tokyo
Tokyo Metropolitan Government Reclamation and revetment work (977)
Tokyo Metropolitan Government Reclamation and revetment work (977)
  • [Products & Services]
    "Hybrid Mat" -High elasticity mat for retention
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    March 2014
  • [Location]
    Tokyo
2013 Offshore Haneda Shallow Area Sand Replenishment Work
2013 Offshore Haneda Shallow Area Sand Replenishment Work
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    December 2013
  • [Location]
    Tokyo
Tokyo 2015 Odaiba Seaside Park Recreational Water Area Lower Underwater Screen Installation
Tokyo 2015 Odaiba Seaside Park Recreational Water Area Lower Underwater Screen Installation
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    March 2012
  • [Location]
    Tokyo
Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    April 2014
  • [Location]
    Tokyo
slope protection works
slope protection works
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    2001
  • [Location]
    Tokyo