Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Yamaguchi Prefecture Erosion control slope construction(739)
Yamaguchi Prefecture Erosion control slope construction(739)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    May 2007
  • [Location]
    Yamaguchi
Yamaguchi Prefecture Normal erosion control slope work (738)
Yamaguchi Prefecture Normal erosion control slope work (738)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2008
  • [Location]
    Yamaguchi
Yamaguchi Prefecture Seawall embankment reinforcement slope work (737)
Yamaguchi Prefecture Seawall embankment reinforcement slope work (737)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    January 2008
  • [Location]
    Yamaguchi
Yamaguchi Prefecture River slope protection work (736)
Yamaguchi Prefecture River slope protection work (736)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2006
  • [Location]
    Yamaguchi
Yamaguchi Prefecture River maintenance slope protection work (735)
Yamaguchi Prefecture River maintenance slope protection work (735)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2006
  • [Location]
    Yamaguchi
Temporary sidewalk earthwork for detour route (1108)
Temporary sidewalk earthwork for detour route (1108)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    February 2021
  • [Location]
    Yamaguchi
Yamaguchi Prefecture Road improvement work (1106)
Yamaguchi Prefecture Road improvement work (1106)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2017
  • [Location]
    Yamaguchi
Disposal site maintenance work
Disposal site maintenance work
  • [Products & Services]
    "Gundle Sheet HD"-High Density Polyethylene sheet-
  • [Purpose / Application]
    Closed repository
  • [completion of construction]
    March 2008
  • [Location]
    Yamaguchi
Yamaguchi Port and Harbor Dredging(964)
Yamaguchi Port and Harbor Dredging(964)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    September 2013
  • [Location]
    Yamaguchi
Yamaguchi Prefecture Airfield seaweed bed and tidal flat restoration work 1(962)
Yamaguchi Prefecture Airfield seaweed bed and tidal flat restoration work 1(962)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    August 2013
  • [Location]
    Yamaguchi
Yamaguchi Prefecture, Japan Airfield seaweed bed and tidal flat restoration work 2(963)
Yamaguchi Prefecture, Japan Airfield seaweed bed and tidal flat restoration work 2(963)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    August 2013
  • [Location]
    Yamaguchi
Yamaguchi Prefecture Road widening outside intersection improvement (880)
Yamaguchi Prefecture Road widening outside intersection improvement (880)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    August 2014
  • [Location]
    Yamaguchi