Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Miyazaki Dam weir improvement slope protection work (763)
Miyazaki Dam weir improvement slope protection work (763)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    January 2005
  • [Location]
    Miyazaki
Miyazaki Prefecture River improvement slope protection work (762)
Miyazaki Prefecture River improvement slope protection work (762)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2006
  • [Location]
    Miyazaki
Miyazaki Prefecture Comprehensive Field Improvement Project, Three-surface water channel construction (761)
Miyazaki Prefecture Comprehensive Field Improvement Project, Three-surface water channel construction (761)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    February 2009
  • [Location]
    Miyazaki
Miyazaki Prefecture Bridge lower construction method surface protection work (760)
Miyazaki Prefecture Bridge lower construction method surface protection work (760)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    February 2007
  • [Location]
    Miyazaki
Miyazaki Prefecture Disaster restoration three-surface water channel construction (759)
Miyazaki Prefecture Disaster restoration three-surface water channel construction (759)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    March 2007
  • [Location]
    Miyazaki
Miyazaki Prefecture Regulating reservoir three-surface tensioned channel construction (758)
Miyazaki Prefecture Regulating reservoir three-surface tensioned channel construction (758)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    March 2003
  • [Location]
    Miyazaki
Miyazaki Prefecture Three-surface road lining waterway construction (757)
Miyazaki Prefecture Three-surface road lining waterway construction (757)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    December 2012
  • [Location]
    Miyazaki
Miyazaki Prefecture road maintenance work
Miyazaki Prefecture road maintenance work
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2005
  • [Location]
    Miyazaki
Miyazaki Prefecture Waterway disaster restoration temporary work (1021)
Miyazaki Prefecture Waterway disaster restoration temporary work (1021)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    February 2018
  • [Location]
    Miyazaki
Miyazaki Prefecture Road improvement and widening work (889)
Miyazaki Prefecture Road improvement and widening work (889)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    April 2004 - June 2004
  • [Location]
    Miyazaki
Miyazaki Pref. road widening 2(894)
Miyazaki Pref. road widening 2(894)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    July 2005 - January 2006
  • [Location]
    Miyazaki
Miyazaki Pref. road widening work (891)
Miyazaki Pref. road widening work (891)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    June 2003 - December 2003
  • [Location]
    Miyazaki