Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Gifu Prefecture, Japan Three-surface canal lining work for erosion control project 1 (590)
Gifu Prefecture, Japan Three-surface canal lining work for erosion control project 1 (590)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    September 2018
  • [Location]
    Gifu
Gifu Prefecture Infrastructure Construction
Gifu Prefecture Infrastructure Construction
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2012
  • [Location]
    Gifu
Gifu Prefecture, Japan Three-surface canal lining work for erosion control project 1 (588)
Gifu Prefecture, Japan Three-surface canal lining work for erosion control project 1 (588)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    March 2016
  • [Location]
    Gifu
Gifu Prefecture Three-surface waterway lining for road reconstruction (587)
Gifu Prefecture Three-surface waterway lining for road reconstruction (587)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    September 2010
  • [Location]
    Gifu
Gifu Prefecture Disaster Recovery
Gifu Prefecture Disaster Recovery
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    April 2011
  • [Location]
    Gifu
Gifu Prefecture, Road reinforced soil wall lower slope protection work (585)
Gifu Prefecture, Road reinforced soil wall lower slope protection work (585)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2006
  • [Location]
    Gifu
Gifu Prefecture River improvement slope protection work (584)
Gifu Prefecture River improvement slope protection work (584)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    2014
  • [Location]
    Gifu
Gifu Prefecture Three-surface canal comprehensive improvement project (583)
Gifu Prefecture Three-surface canal comprehensive improvement project (583)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    January 2014
  • [Location]
    Gifu
Gifu Prefecture, drainage canal disaster restoration work (582)
Gifu Prefecture, drainage canal disaster restoration work (582)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    March 2011
  • [Location]
    Gifu
Gifu Prefecture slope disaster restoration work (581)
Gifu Prefecture slope disaster restoration work (581)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    April 2016
  • [Location]
    Gifu
Gifu Prefecture Rehabilitation of regulating reservoir channel (580)
Gifu Prefecture Rehabilitation of regulating reservoir channel (580)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    October 2012
  • [Location]
    Gifu
Gifu Prefecture Stormwater trunk canal slope protection construction (579)
Gifu Prefecture Stormwater trunk canal slope protection construction (579)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2013
  • [Location]
    Gifu