Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Tokushima Prefecture Disaster recovery reservoir slope protection work (755)
Tokushima Prefecture Disaster recovery reservoir slope protection work (755)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2013
  • [Location]
    Tokushima
Tokushima Prefecture River revetment slope protection work (high water revetment greening) (1101)
Tokushima Prefecture River revetment slope protection work (high water revetment greening) (1101)
  • [Products & Services]
    Honeycomb Frame Spike
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 1998
  • [Location]
    Tokushima
Tokushima Pref. roadbed construction (886)
Tokushima Pref. roadbed construction (886)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2012
  • [Location]
    Tokushima
Tokushima Prefecture School facility disaster recovery work (887)
Tokushima Prefecture School facility disaster recovery work (887)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    September 2012 - November 2012
  • [Location]
    Tokushima
Tokushima construction road earth retaining (831)
Tokushima construction road earth retaining (831)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2013
  • [Location]
    Tokushima