Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Gifu Prefecture Forest Road Establishment Work
Gifu Prefecture Forest Road Establishment Work
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    August 2011
  • [Location]
    Gifu
Gifu Prefecture, Agricultural road channel slope protection work (577)
Gifu Prefecture, Agricultural road channel slope protection work (577)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    October 2014
  • [Location]
    Gifu
Gifu Prefecture Bridge construction, three-surface channel construction (576)
Gifu Prefecture Bridge construction, three-surface channel construction (576)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    February 2012
  • [Location]
    Gifu
Gifu Prefecture Reservoir slope protection work (575)
Gifu Prefecture Reservoir slope protection work (575)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2015
  • [Location]
    Gifu
Gifu Prefecture Disaster Prevention Construction
Gifu Prefecture Disaster Prevention Construction
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2012
  • [Location]
    Gifu
Gifu Prefecture Dam construction project river attachment road slope protection (573)
Gifu Prefecture Dam construction project river attachment road slope protection (573)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2014
  • [Location]
    Gifu
Gifu Prefecture Single Prefectural Collapse Breach Prevention Work (General Route 303)
Gifu Prefecture Single Prefectural Collapse Breach Prevention Work (General Route 303)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    July 2012
  • [Location]
    Gifu
Gifu Prefecture Road Disaster Prevention Work
Gifu Prefecture Road Disaster Prevention Work
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    March 2003
  • [Location]
    Gifu
Cultivated land disaster restoration work (1114)
Cultivated land disaster restoration work (1114)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Gifu
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    March 2012
  • [Location]
    Gifu
Gifu Prefecture Bridge reinforcement and repair work (947)
Gifu Prefecture Bridge reinforcement and repair work (947)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2014
  • [Location]
    Gifu
Gifu Prefecture, river low water revetment construction (946)
Gifu Prefecture, river low water revetment construction (946)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    March 2014
  • [Location]
    Gifu