Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Shin Mikuni Tunnel Construction
Shin Mikuni Tunnel Construction
  • [Products & Services]
    "Gundle Sheet HD"-High Density Polyethylene sheet-
  • [Purpose / Application]
  • [completion of construction]
    December 2018
  • [Location]
    Gumma
Gunma Prefecture Erosion control facility improvement channel construction (993)
Gunma Prefecture Erosion control facility improvement channel construction (993)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    June 2014
  • [Location]
    Gumma
Gunma, Japan: Covering of earthbag outside of revetment floor construction (991)
Gunma, Japan: Covering of earthbag outside of revetment floor construction (991)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    November 2014
  • [Location]
    Gumma
Gunma Erosion Control Facility Improvement Discharge Inlet Erosion Prevention Work (992)
Gunma Erosion Control Facility Improvement Discharge Inlet Erosion Prevention Work (992)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    June 2014
  • [Location]
    Gumma
Gunma Prefecture Multi-level intersection road widening (857)
Gunma Prefecture Multi-level intersection road widening (857)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    November 2003
  • [Location]
    Gumma
Gunma Prefecture road slope earth retaining disaster restoration work (844)
Gunma Prefecture road slope earth retaining disaster restoration work (844)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    April 2020
  • [Location]
    Gumma
Gunma Prefecture River bank raising (810)
Gunma Prefecture River bank raising (810)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    August 2016
  • [Location]
    Gumma
Water outlet erosion prevention work
Water outlet erosion prevention work
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    2001
  • [Location]
    Gumma