Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Niigata Prefecture Three-surface channel stretching work to strengthen the function of erosion control facilities (613)
Niigata Prefecture Three-surface channel stretching work to strengthen the function of erosion control facilities (613)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    June 2013
  • [Location]
    Nigata
Niigata Prefecture Drainage ditch revetment work(612)
Niigata Prefecture Drainage ditch revetment work(612)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Rivers / Reservoirs / Regulating reservoirs
  • [completion of construction]
    March 2010
  • [Location]
    Nigata
Niigata Prefecture Three-surface canal construction for erosion control (mountainous area disaster prevention measures) (611)
Niigata Prefecture Three-surface canal construction for erosion control (mountainous area disaster prevention measures) (611)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
  • [completion of construction]
    August 2012
  • [Location]
    Nigata
Slope protection work for reservoir field improvement project in Niigata Prefecture (610)
Slope protection work for reservoir field improvement project in Niigata Prefecture (610)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    August 2011
  • [Location]
    Nigata
Niigata Prefecture Reservoir improvement project slope protection work (609)
Niigata Prefecture Reservoir improvement project slope protection work (609)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    October 2015
  • [Location]
    Nigata
Niigata Prefecture Erosion control slope protection work (608)
Niigata Prefecture Erosion control slope protection work (608)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2014
  • [Location]
    Nigata
Niigata Prefecture River bed stabilization and slope protection work (607)
Niigata Prefecture River bed stabilization and slope protection work (607)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    May 2014
  • [Location]
    Nigata
Construction of coastal submarine jetty and sand retaining embankment, Niigata Prefecture (978)
Construction of coastal submarine jetty and sand retaining embankment, Niigata Prefecture (978)
  • [Products & Services]
    "Hybrid Mat" -High elasticity mat for retention
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    August 2008
  • [Location]
    Nigata
Niigata Prefecture Seawall Construction (979)
Niigata Prefecture Seawall Construction (979)
  • [Products & Services]
    "Hybrid Mat" -High elasticity mat for retention
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    August 2012
  • [Location]
    Nigata
Niigata Dry Dock Renovation (927)
Niigata Dry Dock Renovation (927)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2014
  • [Location]
    Nigata
Niigata Erosion Control Weir Reinforcement Work (926)
Niigata Erosion Control Weir Reinforcement Work (926)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2016
  • [Location]
    Nigata
Niigata Erosion Control Weir Construction Road and Other Works (925)
Niigata Erosion Control Weir Construction Road and Other Works (925)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    November 2015
  • [Location]
    Nigata