Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Wakayama Erosion Control Repair Waterway Slope Protection (709)
Wakayama Erosion Control Repair Waterway Slope Protection (709)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    July 2012
  • [Location]
    Wakayama
Wakayama Tunnel Construction
Wakayama Tunnel Construction
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    December 2015
  • [Location]
    Wakayama
Wakayama Prefecture Disaster Prevention Measures Slope Construction (707)
Wakayama Prefecture Disaster Prevention Measures Slope Construction (707)
  • [Products & Services]
    "TACOM"-Fabric formwork-
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    January 2019
  • [Location]
    Wakayama
Nachikatsuura IC improvement work
Nachikatsuura IC improvement work
  • [Products & Services]
    "Gundle Sheet HD"-High Density Polyethylene sheet-
  • [Purpose / Application]
  • [completion of construction]
    February 2004
  • [Location]
    Wakayama
Wakayama Prefecture Waterway erosion prevention disaster restoration work (1008)
Wakayama Prefecture Waterway erosion prevention disaster restoration work (1008)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    February 2019
  • [Location]
    Wakayama
Wakayama Prefecture road slope maintenance work (1010)
Wakayama Prefecture road slope maintenance work (1010)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    January 2017
  • [Location]
    Wakayama
Wakayama Prefecture Corrugated Pipe Repair Work (1009)
Wakayama Prefecture Corrugated Pipe Repair Work (1009)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Inspection / maintenance
  • [completion of construction]
    February 2019
  • [Location]
    Wakayama
Wakayama Prefecture Construction Road Removal and Restoration Peripheral Improvement Work (1011)
Wakayama Prefecture Construction Road Removal and Restoration Peripheral Improvement Work (1011)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    August 2018
  • [Location]
    Wakayama
Wakayama Town road widening (870)
Wakayama Town road widening (870)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    July 2012
  • [Location]
    Wakayama
Wakayama Prefecture Landfill construction sedimentation pond pollution control work (825)
Wakayama Prefecture Landfill construction sedimentation pond pollution control work (825)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    February 2019
  • [Location]
    Wakayama
Wakayama River Weir Temporary Closing Revetment 1(820)
Wakayama River Weir Temporary Closing Revetment 1(820)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    August 2014
  • [Location]
    Wakayama
Wakayama Pref. River Weir Temporary Closing Revetment Work 3(822)
Wakayama Pref. River Weir Temporary Closing Revetment Work 3(822)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2014
  • [Location]
    Wakayama