2009 Nagoya Port Pollution Control Membrane Purchase, Nagoya Port Island Residual Water Discharge Improvement
2009 Nagoya Port Pollution Control Membrane Purchase, Nagoya Port Island Residual Water Discharge Improvement
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2010
  • [Location]
    Aichi
Port of Nagoya No.1 storage yard mud lifting construction
Port of Nagoya No.1 storage yard mud lifting construction
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    February 2015
  • [Location]
    Aichi
FY 2014 No. 22 Shin-Kisogawa Bridge Reinforcement Work
FY 2014 No. 22 Shin-Kisogawa Bridge Reinforcement Work
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    January 2015
  • [Location]
    Aichi
Chubu Electric Power Co., Inc. deep water intake facility at Shin-Nagoya Thermal Power Station, installation of water sealing membrane
Chubu Electric Power Co., Inc. deep water intake facility at Shin-Nagoya Thermal Power Station, installation of water sealing membrane
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
  • [completion of construction]
    March 2001
  • [Location]
    Aichi
Installation of water sealing membrane at Taketoyo Thermal Power Station intake of Chubu Electric Power Co.
Installation of water sealing membrane at Taketoyo Thermal Power Station intake of Chubu Electric Power Co.
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
  • [completion of construction]
    March 2001
  • [Location]
    Aichi
Construction of ash dumping site revetment on the north side of the front face of the Kinuura No. 1 site
Construction of ash dumping site revetment on the north side of the front face of the Kinuura No. 1 site
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    March 2018
  • [Location]
    Aichi
2013 Nagoya Port East Passage (-16m) Dredged soil discharge work
2013 Nagoya Port East Passage (-16m) Dredged soil discharge work
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    December 2013
  • [Location]
    Aichi
Waterfront land development project airport island land preparation work (No. 6)
Waterfront land development project airport island land preparation work (No. 6)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    July 2009
  • [Location]
    Aichi
Nagoya Castle stone wall restoration work
Nagoya Castle stone wall restoration work
  • [Products & Services]
    "Filter sheet TSF" -Anti-suction measures -
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    November 2012 - January 2013
  • [Location]
    Aichi
Dredged soil discharge work at the navigation channel and anchorage (-12m) in the Kinjo Pier area of the Port of Nagoya in 2016.
Dredged soil discharge work at the navigation channel and anchorage (-12m) in the Kinjo Pier area of the Port of Nagoya in 2016.
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    July 2017
  • [Location]