Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Fukuoka harbor navigation channel dredging (975)
Fukuoka harbor navigation channel dredging (975)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2014
  • [Location]
    Fukuoka
Hokkaido disaster restoration waterway lining work (982)
Hokkaido disaster restoration waterway lining work (982)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Inspection / maintenance
  • [completion of construction]
    December 2017
  • [Location]
    Hokkaido
Tokyo Metropolitan Government Reclamation and revetment work (977)
Tokyo Metropolitan Government Reclamation and revetment work (977)
  • [Products & Services]
    "Hybrid Mat" -High elasticity mat for retention
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    March 2014
  • [Location]
    Tokyo
Hokkaido Waterway maintenance and repair work (981)
Hokkaido Waterway maintenance and repair work (981)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Inspection / maintenance
  • [completion of construction]
    June 2018
  • [Location]
    Hokkaido
Ishikawa Harbor Dredging (973)
Ishikawa Harbor Dredging (973)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    February 2014
  • [Location]
    Ishikawa
Yamaguchi Port and Harbor Dredging(964)
Yamaguchi Port and Harbor Dredging(964)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    September 2013
  • [Location]
    Yamaguchi
Yamaguchi Prefecture Airfield seaweed bed and tidal flat restoration work 1(962)
Yamaguchi Prefecture Airfield seaweed bed and tidal flat restoration work 1(962)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    August 2013
  • [Location]
    Yamaguchi
Mie Prefecture Hutou Bridge Lower Structure Construction(958)
Mie Prefecture Hutou Bridge Lower Structure Construction(958)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2013
  • [Location]
    Mie
Mie Prefecture Road bridge construction (959)
Mie Prefecture Road bridge construction (959)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    October 2012
  • [Location]
    Mie
Yamaguchi Prefecture, Japan Airfield seaweed bed and tidal flat restoration work 2(963)
Yamaguchi Prefecture, Japan Airfield seaweed bed and tidal flat restoration work 2(963)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    August 2013
  • [Location]
    Yamaguchi
Kyoto dam temporary access road construction (960)
Kyoto dam temporary access road construction (960)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    January 2013
  • [Location]
    Kyoto
Tottori Repair work outside revetment(969)
Tottori Repair work outside revetment(969)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    January 2014
  • [Location]
    Tottori