Fukuoka Prefecture General national highway improvement road embankment work 1 (1060)
Fukuoka Prefecture General national highway improvement road embankment work 1 (1060)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    September 2007
  • [Location]
    Fukuoka
Fukuoka Prefecture General national highway improvement road embankment work 3(1062)
Fukuoka Prefecture General national highway improvement road embankment work 3(1062)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2007
  • [Location]
    Fukuoka
Lighthouse blindfold construction (1068), Fukuoka, Japan
Lighthouse blindfold construction (1068), Fukuoka, Japan
  • [Products & Services]
  • [Purpose / Application]
  • [completion of construction]
    April 2012
  • [Location]
    Fukuoka
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2001
  • [Location]
    Fukuoka
Fukuoka Prefecture Waterway Bv Underground Passage Temporary Earth Retaining Work (1057)
Fukuoka Prefecture Waterway Bv Underground Passage Temporary Earth Retaining Work (1057)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    February 2002
  • [Location]
    Fukuoka
Fukuoka Prefecture Slope Erosion Prevention Prefectural Bureau Maintenance Work (1031)
Fukuoka Prefecture Slope Erosion Prevention Prefectural Bureau Maintenance Work (1031)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2018
  • [Location]
    Fukuoka
Fukuoka Prefecture Construction for slope protection (1030)
Fukuoka Prefecture Construction for slope protection (1030)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2018
  • [Location]
    Fukuoka
Fukuoka harbor navigation channel dredging (975)
Fukuoka harbor navigation channel dredging (975)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2014
  • [Location]
    Fukuoka
Fukuoka harbor navigation channel and anchorage temporary shoreline construction (974)
Fukuoka harbor navigation channel and anchorage temporary shoreline construction (974)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2014
  • [Location]
    Fukuoka
Fukuoka Prefecture Dredging of port navigation channel and anchorage (971)
Fukuoka Prefecture Dredging of port navigation channel and anchorage (971)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    July 2014
  • [Location]
    Fukuoka
Fukuoka School Retaining Wall Improvement (911)
Fukuoka School Retaining Wall Improvement (911)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    December 2002
  • [Location]
    Fukuoka
Fukuoka Prefecture Road improvement and widening work (913)
Fukuoka Prefecture Road improvement and widening work (913)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    November 2006 - January 2007
  • [Location]
    Fukuoka