Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Mie Prefecture Bridge substructure construction2(955)
Mie Prefecture Bridge substructure construction2(955)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2016
  • [Location]
    Mie
Mie Prefecture Storm Surge Countermeasure Load Reduction Work (866)
Mie Prefecture Storm Surge Countermeasure Load Reduction Work (866)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    April 2012
  • [Location]
    Mie
Mie Prefecture Interchange road widening 2 (868)
Mie Prefecture Interchange road widening 2 (868)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    February 2010
  • [Location]
    Mie
Mie Prefecture Interchange road widening work 1 (867)
Mie Prefecture Interchange road widening work 1 (867)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    August 2012
  • [Location]
    Mie
Hinachi Dam Segmentation Fence Maintenance Work
Hinachi Dam Segmentation Fence Maintenance Work
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    February 2011
  • [Location]
    Mie
Hinachi Dam: Construction of a dividing fence
Hinachi Dam: Construction of a dividing fence
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    February 2012
  • [Location]
    Mie
Yokkaichi Port Kasumigafuchi North Pier Area Road (Kasumi No. 4 Main Line) Bridge Construction
Yokkaichi Port Kasumigafuchi North Pier Area Road (Kasumi No. 4 Main Line) Bridge Construction
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    October 2012
  • [Location]
    Mie
Yokkaichi Port Kasumigaura North Pier Area Kasumi No.4 Main Bridge Lower Section (P38? P47)
Yokkaichi Port Kasumigaura North Pier Area Kasumi No.4 Main Bridge Lower Section (P38? P47)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    April 2013
  • [Location]
    Mie
Levee maintenance and management work in the jurisdiction of the Nanno Sub-branch and others in 2014
Levee maintenance and management work in the jurisdiction of the Nanno Sub-branch and others in 2014
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2015
  • [Location]
    Mie
Akabane River bridge repair work
Akabane River bridge repair work
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2017
  • [Location]
    Mie
FY 2014 No.1 Ise Bridge Nagara River Lower Construction
FY 2014 No.1 Ise Bridge Nagara River Lower Construction
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2016
  • [Location]
    Mie
2014 No.1 Ise Bridge, Ibigawa River Lower section construction
2014 No.1 Ise Bridge, Ibigawa River Lower section construction
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2016
  • [Location]
    Mie