Projects
Civil engineering Project Portfolio
Current search settings
- business:Products and Services
- Purpose / Application:No settingsSetting Change
- Location:MieSetting Change
Mie Prefecture Bridge substructure construction2(955)
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- May 2016
-
- [Location]
- Mie
Mie Prefecture Storm Surge Countermeasure Load Reduction Work (866)
-
- [Products & Services]
- "EDO-EPS Method"-Lightweight embankment method-
-
- [Purpose / Application]
- Lightweight embankment / Reinforced soil
-
- [completion of construction]
- April 2012
-
- [Location]
- Mie
Mie Prefecture Interchange road widening 2 (868)
-
- [Products & Services]
- "EDO-EPS Method"-Lightweight embankment method-
-
- [Purpose / Application]
- Lightweight embankment / Reinforced soil
-
- [completion of construction]
- February 2010
-
- [Location]
- Mie
Mie Prefecture Interchange road widening work 1 (867)
-
- [Products & Services]
- "EDO-EPS Method"-Lightweight embankment method-
-
- [Purpose / Application]
- Lightweight embankment / Reinforced soil
-
- [completion of construction]
- August 2012
-
- [Location]
- Mie
Hinachi Dam Segmentation Fence Maintenance Work
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- February 2011
-
- [Location]
- Mie
Hinachi Dam: Construction of a dividing fence
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- February 2012
-
- [Location]
- Mie
Yokkaichi Port Kasumigafuchi North Pier Area Road (Kasumi No. 4 Main Line) Bridge Construction
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- October 2012
-
- [Location]
- Mie
Yokkaichi Port Kasumigaura North Pier Area Kasumi No.4 Main Bridge Lower Section (P38? P47)
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- April 2013
-
- [Location]
- Mie
Levee maintenance and management work in the jurisdiction of the Nanno Sub-branch and others in 2014
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- June 2015
-
- [Location]
- Mie
Akabane River bridge repair work
-
- [Products & Services]
- "Silt Protector"-Pollution control membrane-
-
- [Purpose / Application]
- Pollution preventing measures
-
- [completion of construction]
- May 2017
-
- [Location]
- Mie
Filter by Purpose / Application or Industry
Filter by Purpose / Application or Industry
Civil engineering
[ Fields ]
[ Purpose / Application ]
- Pollution preventing measures
- Soft ground measures
- Prevention of suckingout / Washingout moat
- Rivers / Reservoirs / Regulating reservoirs
- Temporary construction / Rockfall protection / Earth retaining
- Slope protection
- Lightweight embankment / Reinforced soil
- Open land fill / Capping / Detection systems / contaminated soil containment
- Closed repository
- Offshore disposal-site
- Inspection / maintenance
- Shelters / Medical facilities
Filter by location
- Hokkaido
- Aomori
- Iwate
- Miyagi
- Akita
- Yamagata
- Fukushima
- Saitama
- Chiba
- Tokyo
- Kanagawa
- Tochigi
- Gumma
- Ibaraki
- Nigata
- Yamanashi
- Nagano
- Toyama
- Ishikawa
- Fukui
- Gifu
- Shizuoka
- Mie
- Aichi
- Shiga
- Kyoto
- Osaka
- Hyogo
- Nara
- Wakayama
- Tottori
- Shimane
- Okayama
- Hiroshima
- Yamaguchi
- Tokushima
- Ehime
- Kochi
- Fukuoka
- Saga
- Oita
- Nagasaki
- Kumamoto
- Miyazaki
- Kagoshima
- Okinawa



