Hiroshima, Japan Barrier-free school facility project slope construction (875)
Hiroshima, Japan Barrier-free school facility project slope construction (875)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    December 2012
  • [Location]
    Hiroshima
Hiroshima Prefecture road improvement and widening work (876)
Hiroshima Prefecture road improvement and widening work (876)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 1999
  • [Location]
    Hiroshima
Hiroshima Prefecture road widening (873)
Hiroshima Prefecture road widening (873)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    January 2005
  • [Location]
    Hiroshima
Yamaguchi Prefecture General Prefectural Road Stop Raising Work (878)
Yamaguchi Prefecture General Prefectural Road Stop Raising Work (878)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    August 2006
  • [Location]
    Yamaguchi
Hiroshima Prefecture, sidewalk installation (877)
Hiroshima Prefecture, sidewalk installation (877)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2012
  • [Location]
    Hiroshima
Hiroshima Prefecture Sidewalk widening (874)
Hiroshima Prefecture Sidewalk widening (874)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    January 2007 - February 2007
  • [Location]
    Hiroshima
Fukuoka Prefecture Soft Ground Surface Treatment (Installation of Reinforcing Material) Measures (851)
Fukuoka Prefecture Soft Ground Surface Treatment (Installation of Reinforcing Material) Measures (851)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    September 2014
  • [Location]
    Fukuoka
Hokkaido: Construction for road cover disaster prevention (855)
Hokkaido: Construction for road cover disaster prevention (855)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    July 2012 - October 2012
  • [Location]
    Hokkaido
Yamanashi Prefecture Private power generation facility manhole load reduction work (859)
Yamanashi Prefecture Private power generation facility manhole load reduction work (859)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    February 2014
  • [Location]
    Yamanashi
Gunma Prefecture Multi-level intersection road widening (857)
Gunma Prefecture Multi-level intersection road widening (857)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    November 2003
  • [Location]
    Gumma
Aichi Prefecture Construction road foundation partition (852)
Aichi Prefecture Construction road foundation partition (852)
  • [Products & Services]
    "Filter sheet TSF" -Anti-suction measures -
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    November 2012 - January 2013
  • [Location]
    Aichi
Gifu Pref. Construction for ground improvement measures for foundation of expressway JCT structure (849)
Gifu Pref. Construction for ground improvement measures for foundation of expressway JCT structure (849)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    April 2010
  • [Location]
    Gifu