Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Yamanashi Pref., Earth Pressure Reduction Work on the Back of Bridge Abutment (858)
Yamanashi Pref., Earth Pressure Reduction Work on the Back of Bridge Abutment (858)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    October 2013
  • [Location]
    Yamanashi
Tochigi Prefecture, road widening work 1 (860)
Tochigi Prefecture, road widening work 1 (860)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    February 2014
  • [Location]
    Tochigi
Tochigi Prefecture Road widening3(862)
Tochigi Prefecture Road widening3(862)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    June 2012~.
  • [Location]
    Tochigi
Tochigi Prefecture Road widening work 2 (861)
Tochigi Prefecture Road widening work 2 (861)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    November 2014
  • [Location]
    Tochigi
Temporary Installation and Curing of Breakwater Caisson in Ishikawa Prefecture (853)
Temporary Installation and Curing of Breakwater Caisson in Ishikawa Prefecture (853)
  • [Products & Services]
    "Filter sheet TSF" -Anti-suction measures -
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    August 2010
  • [Location]
    Ishikawa
Fukui, Japan Coastal Detached Foundation(854)
Fukui, Japan Coastal Detached Foundation(854)
  • [Products & Services]
    "Filter sheet TSF" -Anti-suction measures -
  • [Purpose / Application]
    Prevention of suckingout / Washingout moat
  • [completion of construction]
    June 2017
  • [Location]
    Fukui
Kanagawa Prefecture Landfill ground improvement work (847)
Kanagawa Prefecture Landfill ground improvement work (847)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    June 2018
  • [Location]
    Kanagawa
Aichi Prefecture Land development project for seaside airport island soft ground countermeasure work (848)
Aichi Prefecture Land development project for seaside airport island soft ground countermeasure work (848)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    July 2009
  • [Location]
    Aichi
Osaka Prefecture Soft Ground Surface Treatment Measures (850)
Osaka Prefecture Soft Ground Surface Treatment Measures (850)
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    May 2011
  • [Location]
    Osaka
Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)
Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)
  • [Products & Services]
    "EDO-EPS Method"-Lightweight embankment method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    December 2011
  • [Location]
    Ibaraki
Kumamoto Prefecture, disaster waste separation partition wall construction1(833)
Kumamoto Prefecture, disaster waste separation partition wall construction1(833)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
  • [completion of construction]
    February 2017
  • [Location]
    Kumamoto
Miyagi typhoon disaster earth retaining repair work (845)
Miyagi typhoon disaster earth retaining repair work (845)
  • [Products & Services]
    "Max Wall"-Continuous box-type steel frame-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2019
  • [Location]
    Miyagi