Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Nagaura (26) Removal of mooring facilities
Nagaura (26) Removal of mooring facilities
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2015
  • [Location]
    Kanagawa
Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    April 2014
  • [Location]
    Tokyo
Minamisoma City decontamination and storage management of removed soil, etc.
Minamisoma City decontamination and storage management of removed soil, etc.
  • [Products & Services]
    "Strong Grid TSG"-for soft ground-
  • [Purpose / Application]
    Soft ground measures
  • [completion of construction]
    December 2016
  • [Location]
    Fukushima
FY 2008 Disaster Prevention and Safety Grant (Safety and Security) Disaster Prevention Work
FY 2008 Disaster Prevention and Safety Grant (Safety and Security) Disaster Prevention Work
  • [Products & Services]
    "MWG Method"-Temporary protective fence construction-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    June 2019
  • [Location]
    Nagano
Dredged soil discharge work at the navigation channel and anchorage (-12m) in the Kinjo Pier area of the Port of Nagoya in 2016.
Dredged soil discharge work at the navigation channel and anchorage (-12m) in the Kinjo Pier area of the Port of Nagoya in 2016.
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    July 2017
  • [Location]
    Aichi
Hakata Port (Central Passage Area) Dredging of Navigation Channel (-12m) (North Section 9)
Hakata Port (Central Passage Area) Dredging of Navigation Channel (-12m) (North Section 9)
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    February 2014
  • [Location]
    Fukuoka
Iwakuni Airfield (26) Seagrass bed and tidal flat restoration work
Iwakuni Airfield (26) Seagrass bed and tidal flat restoration work
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    May 2016
  • [Location]
    Yamaguchi
Arasawa No. 3 slope repair work for disaster prevention dam facility improvement project
Arasawa No. 3 slope repair work for disaster prevention dam facility improvement project
  • [Products & Services]
    "MWG Method"-Temporary protective fence construction-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    December 2016
  • [Location]
    Iwate
Ube Port (-13m) Dredging
Ube Port (-13m) Dredging
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    June 2012
  • [Location]
    Yamaguchi
General Route 452 Improvement Work in Katsurazawa Central, Mikasa City
General Route 452 Improvement Work in Katsurazawa Central, Mikasa City
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    2010
  • [Location]
    Hokkaido
Niigata Port (West Port Area) Navigation Berthing Ancillary Facilities Foundation Construction
Niigata Port (West Port Area) Navigation Berthing Ancillary Facilities Foundation Construction
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures
  • [completion of construction]
    August 2014
  • [Location]
    Nigata
H27 port repair work (public) clear carry-over, Part 1 H28 port repair work (prefectural), Part 1 merger
H27 port repair work (public) clear carry-over, Part 1 H28 port repair work (prefectural), Part 1 merger
  • [Products & Services]
    "Silt Protector"-Pollution control membrane-
  • [Purpose / Application]
    Pollution preventing measures / Rivers / Reservoirs / Regulating reservoirs
  • [completion of construction]
    November 2016
  • [Location]
    Kanagawa