Projects

Civil engineering Project Portfolio

back to Projects TOP

Current search settings
Oita Prefecture Town road bridge abutment rubbing work (1055)
Oita Prefecture Town road bridge abutment rubbing work (1055)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    February 2004
  • [Location]
    Oita
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
Installation of rockfall protection for hydraulic pipes, Fukuoka Prefecture (1046)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    October 2001
  • [Location]
    Fukuoka
Fukuoka Prefecture Waterway Bv Underground Passage Temporary Earth Retaining Work (1057)
Fukuoka Prefecture Waterway Bv Underground Passage Temporary Earth Retaining Work (1057)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    February 2002
  • [Location]
    Fukuoka
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
Installation of rockfall buffer material for national highway disaster prevention, Gifu Prefecture (1043)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    March 2012
  • [Location]
    Gifu
Hiroshima Prefecture, gymnasium construction work (1052)
Hiroshima Prefecture, gymnasium construction work (1052)
  • [Products & Services]
    "RRR-B construction method" -Rigid wall embankment reinforced earth wall method-
  • [Purpose / Application]
    Lightweight embankment / Reinforced soil
  • [completion of construction]
    August 2002
  • [Location]
    Hiroshima
Kagoshima National Highway Disaster Prevention Work (1045)
Kagoshima National Highway Disaster Prevention Work (1045)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2003
  • [Location]
    Kagoshima
Mie National Highway Public Works Facility Protection (1044)
Mie National Highway Public Works Facility Protection (1044)
  • [Products & Services]
    "SAM Method"-Rockfall buffer method-
  • [Purpose / Application]
    Temporary construction / Rockfall protection / Earth retaining
  • [completion of construction]
    January 2009
  • [Location]
    Mie
Fukuoka Prefecture Slope Erosion Prevention Prefectural Bureau Maintenance Work (1031)
Fukuoka Prefecture Slope Erosion Prevention Prefectural Bureau Maintenance Work (1031)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    November 2018
  • [Location]
    Fukuoka
Oita Prefecture Maintenance and repair weed control measures (1025)
Oita Prefecture Maintenance and repair weed control measures (1025)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    March 2017
  • [Location]
    Oita
Kagoshima Pref. National Road Pipe Reconstruction Safety Weed Prevention Work (1023)
Kagoshima Pref. National Road Pipe Reconstruction Safety Weed Prevention Work (1023)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    January 2018
  • [Location]
    Kagoshima
Nagasaki Pref. General road maintenance and management contract for road surface protection work outside of general national highway (1027)
Nagasaki Pref. General road maintenance and management contract for road surface protection work outside of general national highway (1027)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
    Slope protection
  • [completion of construction]
    September 2019
  • [Location]
    Nagasaki
Nagasaki General Prefectural Road Improvement and Weed Prevention Work (1026)
Nagasaki General Prefectural Road Improvement and Weed Prevention Work (1026)
  • [Products & Services]
    Concrete Canvas
  • [Purpose / Application]
  • [completion of construction]
    March 2018
  • [Location]
    Nagasaki